CGWB NOC Compliance -Æ Water Harvesting
No Objection Certificate (NOC) compliance guidelines related to groundwater abstraction issued by the Central Ground Water Authority (CGWA). These guidelines are essential for industries, infrastructure projects, and mining projects that abstract groundwater. Here are the key points:
Scope and Objective:
The CGWA evaluates proposals and requests for groundwater abstraction.
The guidelines apply to both notified and non-notified areas.
Notified Areas:
For drinking and domestic purposes:
Individual households must comply with specific criteria.
Other than individual households, different rules apply.
Non-notified areas have separate criteria for industries, infrastructure projects, and mining projects.
Compliance Conditions in NOC:
Rainwater Harvesting: Industries must undertake artificial recharge to groundwater through rainwater harvesting structures within 45 days of receiving the NOC.
Water Flow Meter: Installation of a digital water flow meter with telemetry on borewells is mandatory.
Calibration: The flow meter should be calibrated yearly by an authorized agency.
Observation Wells (Piezometers): Purpose-built observation wells (piezometers) must be constructed for groundwater level monitoring.
Saline Groundwater Abstraction:
The guidelines address abstraction of saline groundwater.
Proper management and monitoring are crucial.
Change in Land Use:
Any change in land use affecting groundwater abstraction requires evaluation.
Processing Fee:
Proponents must pay restoration or groundwater abstraction charges based on the quantum of groundwater extraction.