2021-04-10T07:30:12
Digital Flow Meter With Telemetry As Per CGWA Guidelines
Installation of Digital Water Flow Meter on Ground water abstraction structures
- reg.
Whereas the Central Government constituted the Central Ground Water Authority
(hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th
January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000
and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of
Environment & Forests, for the purposes of regulation and control of ground water
development and management in the whole of India and to issue necessary regulatory
directions.
And whereas the Authority has issued ‘Guidelines to control and regulate ground water
extraction in India’ vide notification number 3289(E) dated 24th September, 2020, wherein
under Section 9 (i) “Installation of digital water flow meter (conforming to BIS/ IS standards)
having telemetry system in the abstraction structure(s) shall be mandatory for all users
seeking No Objection Certificate and intimation regarding their installation shall be
communicated to the CGWA within 30 days of grant of No Objection Certificate through the
web-portal.”
THIS IS TO BRING TO THE NOTICE OF ALL GROUND WATER USERS THAT:
All the project proponents/users drawing ground water and seeking/having NOC
shall have to mandatorily install tamper-proof digital water flow meters with telemetry
on all the ground water abstraction structures within their premises.
All the Micro and Small Enterprises drawing less than 10 cum/day shall also be
mandatorily required to install digital water flow meters on all the ground water
abstraction structures within their premises. Such enterprises shall be subjected to
randomised inspections.
The afore-mentioned conditions need to be strictly followed by all the users and any
ground water withdrawal without the installation of tamper-proof digital water
flow meters and telemetry (wherever applicable) shall be construed as illegal.
Non-compliance of these conditions shall invite a Penalty provision and/or
Environmental Compensation against the proponent for illegal withdrawal of ground
water as per the CGWA Guidelines and may result in cancellation/rejection of NOC
and sealing of ground water abstraction structures.
Allegiance water Management